Evolution of ERTMSEuropean Rail Traffic Management System from Level 2 (ERTMSEuropean Rail Traffic Management System L2Level 2. ERTMS functional level) toOperator Terminal Level 3 (ERTMSEuropean Rail Traffic Management System L3Level 3. ERTMS functional level), thanks toOperator Terminal the “trainAny guided drive vehicle on the track, with or without coupl... integrity” function carried out entirely on boardEquipment. Term of workshop production, without the aid of trackside equipment (trackHistorical railway line locution circuits). A very simplified solution that canController Area Network also include ERTMSEuropean Rail Traffic Management System with the RBCRadio Block Centre. See Automatic Train Control (ATC), ACCM and SCCM subsystems integrated in the Central Post; in this integrated way it islsolation Mode called ERTMS ALLintoONECommon item to identify ERTMS L3 with RBC, ACCM and SCCM sub... (commonly called ERTMSEuropean Rail Traffic Management System ALLinONE). In this configuration the RBCRadio Block Centre. See Automatic Train Control (ATC) Front End – Back End solution canController Area Network also be found. This solution avoids toOperator Terminal install in a long distance some RBCs (e.g. one RBCRadio Block Centre. See Automatic Train Control (ATC) every 80-100 km) in the Central Post, avoiding the HandoverRBC Handover and BTS Handover. RBC Handover, in the Central ... between RBCs, besides the necessary one between BTSBase Transceiver Station, in GSM. V. HandoverRBC Handover and BTS Handover. RBC Handover, in the Central ..., HandoverRBC Handover and BTS Handover. RBC Handover, in the Central ... RBCRadio Block Centre. See Automatic Train Control (ATC) Free, European RailSteel profile constituting the track, which represents the f... Traffica Management SystemSet of interacting entities, conceptually aggregable in a ra....
Link... for your business